Ing
jinis mesin hook blastingumume duwe tampilan sing luwih gedhe, lan proses instalasi luwih rumit tinimbang peralatan cilik. Instalasi lan mesin uji sing bener minangka kunci kanggo njamin operasi normal peralatan mengko. Ing operasi dhisikan sing ora trampil, pangguna kudu ngetutake instruksi personel sing relevan utawa ngrujuk pandhuane. Operasi sing ora sah bisa kanthi gampang nyebabake kerusakan ing
mesin blasting shot shot. Ingshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. Ing
jinis mesin hook blasting is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. Ingprecautions for the installation and debugging of the relevant components are introduced below.
1. Piranti njupuk blasting:
Ingshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. angkat lan sekrup conveyor:
Pisanan nglakokake tes tanpa beban kanggo mriksa apa ember angkat lan pisau spiral mlaku ing arah sing bener, banjur kencengake sabuk pengangkat menyang ketegangan moderat kanggo ngindhari penyimpangan, banjur nindakake tes beban kanggo mriksa operasi lan kapasitas ngirimake, apa ana gangguan lan gangguan geter, mriksa lan mbusak alangan.
3. Pemisah pil pasir:
Priksa dhisik yen gerakan domba fleksibel, banjur priksa posisi sing tepat saka piring pamisah, banjur nalika angkat dipasang lan debug, terus ana aliran nembak baja, lan priksa manawa tembakan baja kasebut mili metu lan tiba nalika chute dibuwang